Even a 10-15 minute delay can trigger a domino effect: other permits are overturned, closures are pushed back, and you could end up with hours, days of delays or penalties.
That's why the FlashCars team prepares every project with precision: route planning, coordination with the authorities, coordination of escort vehicles, site visits - everything works like a well-coordinated operation.
Because when you're moving a multi-tonne transformer, crane or concrete element, every minute counts - and there's no replay.
Racing against time - When every minute counts for oversized shipments
Oversized shipments are a challenge not only because of size or weight, but also because they often have to meet timeframes that are set in stone. In many cases, permits are issued for specific times - for example, at night when traffic is lighter. In such cases, bridge closures, overhead power line shutdowns or police patrols are also strictly timed.
Table of contents
Share
Recommended Posts
Blog
International oversized transport is a complex task due to varying regulations, route restrictions, and logistical challenges. Below, we outline the most common issues and their solutions.
Blog
Oversized transport requires serious preparation and continuous coordination. FlashCars Ltd. has successfully completed the transport of a 45 m long, 4.5 m wide and high 158 t boiler from Tornyiszentmiklós to Szolnok, overcoming a number of logistical and technical challenges.